Abstract
The completions process eliminates the Oil & Gas Industry's need for fracking and improves the production process. This process uses energy and electricity, instead of chemicals and hydraulic fracturing to create pathways (fractures) which enable the formation to deliver petroleum fluids to the surface. This process reduces our carbon footprint and eliminates the chemical dangers to the water table and threat of earthquakes.
Get a summary, plain-language explanation, or ask your own question.
Figures
Description
CROSS-REFERENCE TO RELATED APPLICATIONS
[0001]No cross reference applies.
STATEMENT REGARDING FEDERALLY SPONSORED RESEARCH OR DEVELOPMENT (IF APPLICABLE)
[0002]Federally sponsored research does not apply.
REFERENCE TO SEQUENCE LISTING, A TABLE, OR A COMPUTER PROGRAM LISTING COMPACT DISC APPENDIX (IF APPLICABLE)
[0003]No sequence listing applies.
BACKGROUND OF THE INVENTION
[0004]Through multiple applications, testing, research, and verification, it is found that this Process Utility Patent is specific, non-related to current technology, unique, and proven. The history of the creation of this process patent began with the small scale application for art and design purposes through the Lichtenberg wood burning application. Through further testing it was found to have the appropriate effect for application with a sedimentary and/or conglomerate rock media for the purpose of industry application.
BRIEF SUMMARY OF THE INVENTION
[0005]The completions process, or fracturing method, is intended to establish, improve, and increase connectivity between parallel wellbores. This increases permeability improves transport of in-situ fluids within the formation for means of delivery to wellbore and then surface. This process applies High Voltage electricity through means of AC, DC, or transformer regulated current from one wellbore to the parallel wellbore in order to create a network of fulgurite pathways for fluid transport.
BRIEF DESCRIPTION OF THE SEVERAL VIEWS OF THE DRAWINGS
[0006]
[0007]
[0008]
[0009]
[0010]
[0011]
[0012]
DETAILED DESCRIPTION OF THE INVENTION
[0013]The completions process utilizes electricity to initiate and establish the connectivity from the completions application of an oil or gas well. As shown in
[0014]A High Voltage transformer 14 and/or energy source is prepared on location for the purpose of delivering High Voltage electricity from one pole located in one wellbore 10a at specific measured depth, to the adjacent pole in the parallel wellbore 10b at the corresponding and relative measured depth. High Voltage Cable 16a or 16b, such as XLPE, PEF, PTFE, or FEP, is connected to each of the transmitting and receiving poles. Each cable 16a and 16b is then tethered and connected to a conductive device 18a and 18b pictured in
[0015]Once the conductive devices 18a and 18b are at their respective specified depths, a pump down unit (not shown) pressures up the rubberized plugs 22a and 22b, sealing the wellbores 10a and 10b in front of the plugs 22a and 22b, isolating the devices 18a and 18b. Once isolation is verified in both wellbores 10a and 10b and depth has been re-verified, the energized process may begin.
[0016]The energy source is turned on and voltmeters are brought online for observation. The energy source is powered up and electricity is delivered downhole to begin the process. Once the electricity reaches the conductive devices 18a and 18b, connectivity begins to occur in a branch like pattern surround the wellbores 10a and 10b in a radial geometry with a tendency for reaching the opposite pole. Both electrical sources downhole are delivering high voltage through the formation 12 and conductivity is established by the in-situ connate saltwater within the formation 12. The voltage for the process can be greater than about 20 Kva in one embodiment. In another embodiment, the voltage can be greater than about 50 Kva. Once the electricity reaches each pore space, a Fulgurite formation of the sandstone or limestone will be created. The fulgurite formation establishes the connectivity and the throat space for fluid delivery from the formation 12, to the wellbores 10a and 10b, and finally to the surface.
[0017]The process is finalized when the poles deliver successfully electricity to each other and the voltmeter verifies that connection has been made. The plugs 22a and 22b can be released, the tools are retrieved, and the process is repeated for each predetermined stage (measured depth) of the wellbores 10a and 10b for the purpose of fully executing the process of an entire wellbore completion.
Claims
What is claimed is:
1. A method of creating fractures in an oil and gas formation, the method comprising:
electrifying an oil and gas formation between a first wellbore and a second wellbore to generate fractures in the oil and gas formation.
2. The method of
3. The method of
4. The method of
5. The method of
6. The method of
7. The method of
8. The method of
9. The method of
10. The method of
11. The method of
moving the plugs and the first and second conductive devices to a second location in the first and second wellbores;
setting the plugs in the second location to isolate a second zone in the formation to be fractured; and
electrifying the formation to create fractures in the formation at the second location.
12. The method of